ODE Sistem Planning Details
EXTERIOR WALLS
Minimum ODE ISIPAN Thicknesses In Exterior Walls, Which Are Necessary For Degree - Day Regions As Per TS 825
| * Region | Example City | Thickness | Uninsulated | Insulated | U | Efficiency |
|---|---|---|---|---|---|---|
| cm | W/m2h | W/m2h | W/m2h | % | ||
| 1. Region | İzmir | 3 | 42 | 21 | 0,69 | 48 |
| 2. Region | İstanbul | 4 | 17 | 0,55 | 58 | |
| 3. Region | Ankara | 5 | 15 | 0,47 | 64 | |
| 4. Region | Kayseri | 6 | 11 | 0,36 | 73 |
* Calculated for 15 cm Reinforced Concrete Slab.
* Calculated for 19 cm Brick Walls.
Minimum ODEPOR Thicknesses In Exterior Walls, Which Are Necessary For Degree - Day Regions As Per TS 825
| * Region | Example City | Thickness | Uninsulated | Insulated | U | Efficiency |
|---|---|---|---|---|---|---|
| cm | W/m2h | W/m2h | W/m2h | % | ||
| 1. Region | İzmir | 5 | 45 | 24 | 0,68 | 48 |
| 2. Region | İstanbul | 6 | 19 | 0,58 | 58 | |
| 3. Region | Ankara | 8 | 16 | 0,45 | 64 | |
| 4. Region | Kayseri | 10 | 12 | 0,37 | 73 |
* Calculated for 15 cm Reinforced Concrete Slab.
* Calculated for 19 cm Brick Walls.
Minimum ODE - STONEWOOL Thicknesses In Exterior Walls, Which Are Necessary For Degree - Day Regions As Per TS 825
| * Region | Example City | Thickness | Uninsulated | Insulated | U | Efficiency |
|---|---|---|---|---|---|---|
| cm | W/m2h | W/m2h | W/m2h | % | ||
| 1. Region | İzmir | 5 | 45 | 24 | 0,68 | 48 |
| 2. Region | İstanbul | 6 | 19 | 0,58 | 58 | |
| 3. Region | Ankara | 8 | 16 | 0,45 | 64 | |
| 4. Region | Kayseri | 10 | 12 | 0,37 | 73 |
* Calculated for 15 cm Reinforced Concrete Slab.
* Calculated for 19 cm Brick Walls.
MATTERS TO BE CONSIDERED BEFORE THE APPLICATION OF ODE SISTEM
It must be ensured that the application surface is with leveling and in float with a rough plaster application.
In case of float leakages with lengths of 0,5 - 1 cm or more, the surface must be smoothened with repair plasters.
The application surfaces must be free of swollen plasters, swollen paint residues, dusts, dirt and greases.
The level for beginning the thermal insulation must be marked and this level should be carried to the building's
exterior surface with a water balance.
Plinth promeshs that comply with the insulation thickness must be fixed to the wall with a tolerance of
0,5 - 1 cm expansion joint between them throughout the leveling line.